ManufacturingPakSteel Industries7 months, 3 phases

ERP rollout that closed month-end in days, not weeks

A 400-employee steel manufacturer ran finance, inventory, and HR on disconnected spreadsheets. A phased custom ERP rollout unified operations and cut month-end closing from three weeks to four days.

PakSteel Industries plant floor with ERP terminals
month-end closing time
3 weeks → 4 days
inventory accuracy across 3 warehouses
100%
hours of production downtime during rollout
0

The Challenge

  • Finance, production, and HR each maintained separate spreadsheets that never reconciled with each other.
  • Month-end closing took three weeks of manual consolidation — and the numbers were still disputed.
  • The plant floor ran 24/7; any rollout that stopped production was unacceptable.

The Solution

  • A three-phase rollout: inventory and procurement first, then production tracking, then finance and HR integration.
  • Each phase ran in parallel with the old process until daily reconciliation proved the new system accurate.
  • Mobile terminals on the shop floor replaced paper job cards, feeding production data into costing in real time.
  • Role-based training and a two-week help desk desk at each go-live — the old spreadsheets were retired for good.
The phased plan was the difference. Every go-live was boring — which is exactly what we asked for.